Interconnection of Generators

The Distributed Generation Interconnection process ensures that your Distributed Generation has no adverse impacts on safety, reliability, and power quality. It begins in your stage of planning, continues through the installation of equipment, and completes with Inspections and Signoff.



The Interconnection process is governed by the New York Standardized Interconnection Requirements (SIR). The full New York Standardized Interconnection Requirements and a listing of certified and tested equipment in New York State can be found at: http://www3.dps.state.ny.us/W/PSCWeb.nsf/96f0fec0b45a3c6485257688006a701a/dcf68efca391ad6085257687006f396b/$FILE/SIRDevices.pdf*


For an overview of the process, please follow the links below:


Click here to access application instructions and to download application documentation


Click here to view maps of National Grid’s Secondary Networks


Questions about Distributed Generation or the Interconnection application process? National Grid is here to help you!


Email us at DGS-NY@us.ngrid.com


To reach us by phone


For general questions on < 25 kW: 315-798-5367 (Mike Pilawa)


For generation from 25kW to 20 MW: 315-798-5367 (Mike Pilawa)