| Corporate |
Date |
 |
Granite
State Request for Limited Waiver (.pdf) |
02/09/04 |
 |
Informational
Filing of National Grid USA (.pdf) |
02/09/04 |
 |
Operations Documentation (.pdf) |
02/09/04 |
| |
|
|
| New England |
|
 |
New England Regional System Studies
http://www.iso-ne.com/trans/sys_studies/index.html |
|
 |
New England Regional Interconnection
Studies
http://www.iso-ne.com/genrtion_resrcs/nwgen_inter/status/index.html |
|
 |
LSP Project List 2011(.pdf) |
 |
National Grid Local System Plan 2011(.pdf) |
 |
Local studies performed under Schedule
21 - NEP
Hingham 3rd Transformer Interconnection Study - Final SIS report
dated October 14, 2005 |
10/14/05 |
| |
|
|
| New York |
|
 |
New York Regional System Studies
http://www.nyiso.com/public/services/planning/index.jsp |
|
 |
New York Regional Interconnection
Studies
http://www.nyiso.com/public/services/planning/interconnection_studies_process.jsp |
|
 |
LTP Project List 2011 - New York (.pdf) |
08/31/10 |
 |
National Grid Local Transmission Plan 2009 - New York
NYISO 091407 Posting for FERC Order 890
|
10/14/09 |
 |
For the convenience of our customers, National Grid is providing the following link to the posting made by the New York Independent System Operator, Inc. on mm/dd/yy, in compliance with FERC’s Order No. 890 requirements. National Grid does not endorse or support all aspects of the NYISO’s posting and reserves all rights to seek modification thereof.
|
10/14/09 |
 |
Frontier Reinforcement Project
National
Grid has performed a preliminary study to determine the nature
of transmission changes that may be required in the Buffalo area
if the existing 115 kV generation at NRG Huntley LLC is retired. Click
here to request a summary of the study results from
National Grid.
|
11/09/06 |
 |
New Athens Special Protection System
The Special Protection System Engineering, Construction and Implementation Agreement ("Agreement") between Niagara Mohawk Power Corporation,
d/b/a National Grid ("National Grid") and New Athens Generating Company, LLC, Original Service Agreement 923,
is still currently active, and National Grid reserves its rights under the Agreement to unilaterally remove the SPS
at any time after January 26, 2011. National Grid does not expect to exercise its rights under the Agreement to
unilaterally remove the SPS at the end of the Interim Period (as defined in Section 3.4 of the Agreement). The next
review of the SPS will take place in the second quarter of 2011.
|
08/31/10 |
| |
|
|