Posting Requirements

FERC Order 890

Schedule 20A (HVDC Service)

 Annually Re-evaluate CBM, Section 3.2 of attachment C Schedule 20A (.pdf)
   Attachment K - 12/7/07 Filing (pending at FERC)
 Attachment K - 9/14/07 Draft
 Business Practices
 Business Practice Amendments
 Capacity Reassignment Application
 Conditional Firm Service
 Designation of Network Resources
  Energy and Generation Imbalances
  Grants and Denials (pdf)
 Load Forecast
 Make CBM Set Aside Available Non-Firm, Section 3.2 of attachment C Schedule 20A (.pdf)
 Narratives Regarding ATC changes  - see TTC Change Log on ISONE OASIS Main Page
 Planning Redispatch
 Post and Update CBM
 Post and Update TRM
 TRM Methodology, Section 3.3 of attachment C Schedule 20A (.pdf)
 Transmission Planning Strawman, Attachment 2
 Transmission Studies