About the Project
The J136S Tap Rebuild Project will be rebuilding the existing J136S Tap Line (40 structures) along a new alignment, approximately 40 feet to the east of the existing line; removal of the existing J136S Tap Line (42 structures); replacement of the existing electric conductors; and installing Optical Ground Wire (OPGW) within the existing Rights-Of-Way (ROW) easements.
Vegetation management efforts (40-50 feet of expanded, maintained width within the existing ROW). Construction of new and improved access.